Planning Forward with GSA in Mind

Logistical Considerations

CIO Test

7.105(b)(13) Logistical Considerations

Instructions

1. Describe assumptions concerning contractor or agency support: The assumptions determining contractor or agency support, both initially and over the life of the acquisition, including consideration of contractor or agency maintenance and servicing (see FAR 7.3) and distribution of commercial items.

2. Describe quality assurance, reliability, maintainability, warranties: The reliability, maintainability, and quality assurance requirements, including any planned use of warranties (see FAR Part 46).

3. Describe the requirements for contractor data: The requirements for contractor data (including repurchased data) and data rights, their estimated cost, and the use to be made of the data (see FAR Part 27).

4. Describe standardization concepts: Standardization concepts, including the necessity to designate, in accordance with agency procedures, technical equipment as "standard" so that future purchases of the equipment can be made from the same manufacturing source.

  • No Notes to View
  • Show an example
  • Show an example
  • Show an example
  • Show an example

Buttons have been disabled on this simulated screen. Use the Navigation Arrows to move through the APW tour.

Plan Id
5029
Project Title
CIO Test
Planner
apwadmin@gsa.gov;

SOURCE SELECTION INFORMATION - SEE FAR PART 3.104