Planning Forward with GSA in Mind

Applicable Conditions

Tip!

You may have noticed that the "Add/Edit Comments", "No Comments", and the "Spellcheck" icons and links are deactivated for this tour. We'll tell you about them later.

CIO Test

7.105(a)(2-4) Applicable Conditions

Instructions

1. State all the significant conditions affecting the acquisition, such as - (i) Requirements for compatibility with existing or future systems or programs; and (ii) Any known cost, schedule, and capability or performance constraints. 7.105(a)(2)

2. For cost, discuss any established cost goals and supporting rationale, including life cycle cost, design-to-cost and should-cost (see FAR 2.101). 7.105(a)(3)

3. For capability or performance, describe the required capabilities or performance characteristics of supplies or the performance standards of the services being acquired. State how they relate to the need. 7.105(a)(4)

  • No Notes to View
  • Show an example
  • Show an example
  • Show an example

Buttons have been disabled on this simulated screen. Use the Navigation Arrows to move through the APW tour.